03 Dec CONCEPTUAL DESIGN OF CONTAINER TERMINAL

>

CT Sokhna concept

ECCT has prepared a bid for the construction of the onshore works of the Basin 2 container terminal at Sokhna Port, Egypt. MHC assisted ECCT by preparing a conceptual design of the terminal and setting up a BoQ which was used as input for the bid.

 

Services provided by MHC are:

  • Conceptual design of container terminal, including power load, drainage, potable water, firefighting, soil improvement, RMG foundation and pavement
  • BoQ as input for bid by the Contractor

Client
ECCT
Location
Egypt
Year
2018