| Fertilizer Export Terminal Sokhna Port
16402
post-template-default,single,single-post,postid-16402,single-format-standard,ajax_leftright,page_not_loaded,,wpb-js-composer js-comp-ver-4.2.3,vc_responsive

Fertilizer Export Terminal Sokhna Port

05 Mar Fertilizer Export Terminal Sokhna Port

 

Fertilizer export terminal - Sokhna Port

Fertilizer Export Terminal – Sokhna Port, Egypt

Through the fertiliser terminal, which has started operating in June 2001, annually about 600,000 tons of urea will be exported to overseas markets. The terminal has a storage capacity for 40,000 tons of urea in a warehouse, equipped with intake and outtake conveyors and ship-loading facilities. The shiploader is designed to load vessels up to 45,000 DWT at a rate of 8000 tons per day. The fertiliser is transported from the nearby factory using tipping trucks.

Services provided by MHC are:

  • Layout design of the terminal, including office, sanitation and control room.
  • Capacity calculations for storage, conveyors and loader.
  • Equipment selection and specifications.
  • Calculation of investment and operational costs.
  • Cash-flow and sensitivity analysis.
  • Detailed design of civil, mechanical and electrical works.
  • Civil contracting and construction supervision.
  • Equipment procurement, installation supervision and start-up assistance.

 

Client
Sokhna Port Development Company (SPDC)

 

Location
Sokhna Port, Egypt

 

Year
2000 – 2001